13 delivered facilities
Trunk pipelines, GDS, overhauls, dismantling and power facilities across Uzbekistan.
Showing 13 of 13 projects

Shirin gas distribution station
The new gas distribution station improved the reliability of natural gas supply to the ACWA POWER plant.

Rishtan — Fergana main gas pipeline, second line
The second line significantly increased system capacity and ensured stable gas supply to the Fergana Valley.

Bukhara — Ural main gas pipeline, new line
A new pipeline string was built, increasing transported volumes and securing stable supply of the trunk network.

Bash wind farm, 500 MW
Construction of a 12 km access road to the wind farm site.

Dzhangeldy wind farm, 500 MW
Cable line installation for efficient and stable power transmission.

Metering station for Tashkent TPP “Aksa Energy”
Precise metering of incoming gas volume and parameters for reliable plant supply.

Metering station for Tashkent TPP “Zhingiz Energy”
Precise metering of incoming gas volume and parameters for reliable plant supply.

High-pressure feed gas pipeline to Zhingiz Energy TPP
A pipeline supplying the TPP with natural gas, expanding the plant’s generation capacity.

Overhaul of Bukhara — Ural pipeline, second line
Restoring serviceability and extending the service life of the pipeline string.

Overhaul of Bukhara — Ural pipeline, third line
Restoring serviceability and extending the service life of the pipeline string.

Dismantling of the Gazli — Kogon pipeline
Dismantling obsolete pipeline sections to improve safety and prepare the area for development.

Dismantling of the DBST pipeline, Ø 1020 mm
Dismantling obsolete pipeline sections with a diameter of 1020 mm.

Relocation of the Sokh — Namangan pipeline to a safe zone
Relocating a pipeline section outside a restricted facility in line with industrial safety standards.